Construction claims, proven.

datum organises the entire matter - every document read and flagged honestly, a permanent cited timeline, deterministic delay analysis - and assists your team to a draft where every factual sentence is supported by a verified citation from the record. Your experts stay in command.

datum · Draft · walter-lilly
Chronology Export ready

09_instruction_BLDA_2006-02-02.pdf · p.1

The Contractor is instructed to place an order with Firman Glass Ltd for the Light Wall installation.

07_tender_report_2005-11-24.pdf · p.1

Firman require a period of 23 weeks from the letting of the subcontract

Benchmarked against the courts
Walter Lilly [2012] EWHC 1773 (TCC)Multiplex · Wembley [2007] EWHC 447 (TCC)Cleveland Bridge · The Shard [2012] EWHC 3652 (TCC)Obrascon · FIDIC [2014] EWHC 1028 (TCC)Adyard Abu Dhabi [2011] EWHC 848 (Comm)Van Oord [2015] EWHC 3074 (TCC)Thomas Barnes [2022] EWHC 2598 (TCC)Walter Lilly [2012] EWHC 1773 (TCC)Multiplex · Wembley [2007] EWHC 447 (TCC)Cleveland Bridge · The Shard [2012] EWHC 3652 (TCC)Obrascon · FIDIC [2014] EWHC 1028 (TCC)Adyard Abu Dhabi [2011] EWHC 848 (Comm)Van Oord [2015] EWHC 3074 (TCC)Thomas Barnes [2022] EWHC 2598 (TCC)
No model training on your data Org-level row security at the database Encryption in transit and at rest Certified deletion with written proof GDPR & UAE PDPL posture documentedSecurity
Evidence & timeline

The whole record, read and accountable.

A permanent, cited timeline

Every event carries its date and a verbatim quote from the page it came from, verified in code. The chronology renders from events your team confirmed - never free-written prose.

Evidence & timeline
Timeline · confirmed events
12 Jul 2004Possession of sitePossession of the site is given to the Contractor today
24 Nov 200523-week lead time flaggedFirman require a period of 23 weeks
02 Feb 2006Order instructedinstructed to place an order with Firman Glass Ltd

Record health, stated plainly

Unreadable files, poor scans and uncertain dating are flagged, never papered over. “All documents read” is an earned claim here.

Record health
153 documents read, OCR'd and indexed
2 poor scans flagged for manual review
0 unreadable files · 0 uncertain dates

Flagged documents are excluded from confidence claims until resolved.

Every citation opens the page

The evidence viewer opens the actual page image with the cited words highlighted. Reviewers check evidence in seconds.

Evidence viewer · p.1 of 1
The Contractor is instructed to place an order

The cited words, highlighted on the actual page image - not a reference, the document.

Delay analysis

The days come from the network, never from a model.

A CPM engine, not an opinion

The Primavera schedule is reparsed and the critical path recomputed deterministically - calendars, lags, constraints and all. Schedule anomalies are reported, not silently trusted.

Delay analysis
CPM · forward/backward pass
A1020 Substructure
A1080 Light Wall procurement
A1140 Envelope close-in
A1200 Fit-out zone C

Critical path in accent. Float, lags and calendars computed by code - never by a model.

Causation you can defend

Events link to the activities they hit; impact days come from the network. Where linkage cannot be established, the claim says so.

Linkage · event to impact
02 Feb 2006 · late instructionA1080 Light Wall procurementcritical path · days computed

If a linkage cannot be established, the claim says so - it never bridges the gap with prose.

Claim drafting

Drafts that carry their own proof.

Cited by construction, verified independently

The drafter cannot emit a factual sentence without evidence - the schema rejects it. A separate verifier checks every citation against its source.

Claim drafting
Draft · chronology

On 2 February 2006, the Architect instructed the Contractor to place the order for the Light Wall.1 The tender report had identified a 23-week lead time.2

2 citations verified against the record

The export gate

Contradicted or uncited sentences block export - in code, not in a prompt. Weak support goes to your QA queue for a named reviewer; contradictions can never be approved away.

Export
Export blocked · 1 unresolved sentence

“The instruction was issued in good time.” contradicted

The gate is enforced in code. It cannot be talked out of refusing.

A real document at the end

A .docx with real Word footnotes, each resolving to a document and page in the record.

Export · .docx
EOT_Claim_walter-lilly.docx · 36 footnotes
Every factual sentence supported or team-approved

Real Word footnotes, every one resolving to a document and page in the record.

Ask the record

Ask anything. Get only what the record proves.

Answers with receipts

Every factual sentence in an answer carries a verbatim quote, verified in code before it renders as cited. What the record does not say, datum says it does not say.

Ask the record
Ask the record
When was the Light Wall order placed, and was that too late?
The Architect instructed the order on 2 February 2006.09_instruction_BLDA.pdf p.1

What the record does not say, datum says it does not say.

Every case, remembered

The archive keeps every matter searchable, traceable and reopenable - institutional memory that does not leave with staff.

Case archive
walter-lilly16 docs · 1 claim
multiplex-wembley12 docs · 20 events
obrascon-fidic14 docs · 25 events
Measured, not promised

Tested against what courts actually decided.

11published judgments as answer keys
100%document dating accuracy, 153 documents
86%average event recall, strict matching
26/26cited sentences verified on the exported claim

If a sentence cannot be proven,
it cannot be exported.